Home  / SZ/OEMU/31/1/1 - Cased charges. The design of a model bomb: programme of work, 26/10/40

SZ/OEMU/31/1/1 - Cased charges. The design of a model bomb: programme of work, 26/10/40

Reference code
SZ/OEMU/31/1/1
Level of description
Item
Title
Cased charges. The design of a model bomb: programme of work, 26/10/40
Date/s
1940
Quantity & Format
3 leaves
Creator
Great Britain. Ministry of Fuel and Power. Safety in Mines Research Board.
Scope and content
R.C. 143

D.10

The Research Station is involved in the study of the fragmentation process and of splinter velocities from model-scale bombs. The methods involve the use of photographic equipment to examine fragments and their effects. The designs of the model bomb is described in detail. Drawings of the bomb-casing components, the complete assembly of the bomb, and the ends of bomb-casings and fragments after firing, are included.
Powered by CollectionsIndex+ Collections Online