Estimation of time taken to repair railway bridges
1944
4 leaves
The paper and its associated tables deal with calculations of the average and maximum and minimum times taken to repair bridges damaged by air attack relative to the category of damage [see SZ/AEAF/1/10/1], type of bridge and whether or not attacks were made while the bridge was under repair. The findings are based on an analysis of bridges covered by AEAF Daily Interdiction Reports and air reconnaissance photographs. From external evidence it seems that the paper was written in August 1944 or later.
-
SZ - Zuckerman Archive
-
SZ/AEAF - [Allied Expeditionary Air Force]
-
SZ/AEAF/1 - [AEAF Planning]
-
SZ/AEAF/1/10 - [AEAF Planning. Analysis of photorecces - attacks on bridges]
- SZ/AEAF/1/10/12 - Estimation of time taken to repair railway bridges
-
SZ/AEAF/1/10 - [AEAF Planning. Analysis of photorecces - attacks on bridges]
-
SZ/AEAF/1 - [AEAF Planning]
-
SZ/AEAF - [Allied Expeditionary Air Force]
Previous Item
Next Item