Home  / SZ/AEAF/1/10/12 - Estimation of time taken to repair railway bridges

SZ/AEAF/1/10/12 - Estimation of time taken to repair railway bridges

Reference code
SZ/AEAF/1/10/12
Level of description
Item
Title
Estimation of time taken to repair railway bridges
Date/s
1944
Quantity & Format
4 leaves
Scope and content
The paper and its associated tables deal with calculations of the average and maximum and minimum times taken to repair bridges damaged by air attack relative to the category of damage [see SZ/AEAF/1/10/1], type of bridge and whether or not attacks were made while the bridge was under repair. The findings are based on an analysis of bridges covered by AEAF Daily Interdiction Reports and air reconnaissance photographs. From external evidence it seems that the paper was written in August 1944 or later.
Powered by CollectionsIndex+ Collections Online