PP/15/3/3/41 - [Draft memorandum, Isokon No 3 meeting: J.C.P., Rab Buchanan and Borough Engineer, Windsor, 22/3/35]
PP/15/3/3/41
Item
[Draft memorandum, Isokon No 3 meeting: J.C.P., Rab Buchanan and Borough Engineer, Windsor, 22/3/35]
1935
2 leaves
Buchanan, Rab
Isokon Flats (Windsor) -- Engineers
Windsor -- Borough Council
Isokon Flats (Windsor) -- Rates
Windsor -- Borough Council
Isokon Flats (Windsor) -- Rates
PP/15/3/3/39-40
A guarantee on rates was refused by Isokon. A request was made to the Borough Engineer for a portion of payment on the water, sewerage and roads, to be made. Isokon requested seeing the design, specifications and tenders on work carried out. Attached with original and its copy [PP/15/3/3/39-40].
A guarantee on rates was refused by Isokon. A request was made to the Borough Engineer for a portion of payment on the water, sewerage and roads, to be made. Isokon requested seeing the design, specifications and tenders on work carried out. Attached with original and its copy [PP/15/3/3/39-40].
-
PP - Pritchard Papers
-
PP/15 - Isokon Control Company Ltd, Isokon (Lawn Road) Ltd, Isokon Windsor Ltd, "Isokon 2": Manchester scheme and "Isokon 2": Birmingham scheme, 1928-1975, 1979
-
PP/15/3 - Isokon (Windsor) Ltd
-
PP/15/3/3 - [Isokon (Windsor) Ltd. Corporate correspondence, memoranda and documents, 1934-1947]
- PP/15/3/3/41 - [Draft memorandum, Isokon No 3 meeting: J.C.P., Rab Buchanan and Borough Engineer, Windsor, 22/3/35]
-
PP/15/3/3 - [Isokon (Windsor) Ltd. Corporate correspondence, memoranda and documents, 1934-1947]
-
PP/15/3 - Isokon (Windsor) Ltd
-
PP/15 - Isokon Control Company Ltd, Isokon (Lawn Road) Ltd, Isokon Windsor Ltd, "Isokon 2": Manchester scheme and "Isokon 2": Birmingham scheme, 1928-1975, 1979